The pipe line was laid and loading started at quarter to ten. The M30 wall pour began at twenty past eleven and ran late, with one column half cast. Fifty-five pieces of 25 mm bar were delivered.
Sunday · site work
Sunday · site work
The pipe line was laid and loading started at quarter to ten. The M30 wall pour began at twenty past eleven and ran late, with one column half cast. Fifty-five pieces of 25 mm bar were delivered.