The JS Legacy10 October 2026
Site photograph, 10 October 2026

Saturday · site work

10October
2026

Pest control was on site. Plain concrete of 25 cubic metres and wall concrete of 16.5 cubic metres were required, wall first, and a hundred feet of river sand. The loading order was set for half past seven.

3 photographs