The JS Legacy26 September 2026
Site photograph, 26 September 2026

Saturday · site work

26September
2026

Water was pumped from the rear lift and the wall steel overlap and binder were tied eight feet up in the south wall of the front lift. Rain wasted much of the day, soil levelling could not be done, and the wall bags were stacked.

2 photographs