The JS Legacy1 October 2026
Site photograph, 1 October 2026

Thursday · site work

1October
2026

Fifteenth day of slab curing. The column pit at the gate was excavated and the spoil levelled at the tank side, rings and overlaps went into the lift column, and the shuttering team was absent. Soil near the reinforcement was to be cleaned.

8 photographs