Plain concrete was poured by ready-mix pump. The first mix was wet and was adjusted, the material ran short, and the balance area was left to be cast by hand next day. The steel gang was asked to start at 06:30.
Friday · site work
Friday · site work
Plain concrete was poured by ready-mix pump. The first mix was wet and was adjusted, the material ran short, and the balance area was left to be cast by hand next day. The steel gang was asked to start at 06:30.